A little more about the project
school music concerts at Dian Harapan do not follow a fixed annual schedule, so each concert is a chance to bring different performers and musical styles together. this year's concert was themed after Thank You for the Music, named after the ABBA song. across two sessions, the program featured string orchestras, keroncong, a guitar ensemble, choirs, soloists, guzheng, and wushu, with music ranging from gospel and musical theatre songs, to classical pieces, Disney songs, and Mandarin songs
Here's where I come in
i was responsible for both the audio and lights throughout the concert. with no one available to take over lighting and limited time to prepare, i ended up managing both systems simultaneously. this meant keeping track of the sound mix while also preparing and running lighting cues for the different acts
How it all came together
preparing for a concert with so many types of performances required coordination beyond the mixing console itself. i worked closely with the stage crew to plan microphone placements for each act and determine how equipment should be positioned on stage. different performers had different requirements, from soloists who needed individual microphones to larger ensembles that required up to 8 different condensors, all carefully placed throughout the stage. planning these details ahead of time helped reduce the confusion during transitions and allowed each act to get ready quickly and much more efficiently
i also coordinated with TImothy on stage patching to ensure connections were ready for each performance. with multiple acts sharing the same stage, keeping the inputs and connections organized was the key to making transitions smoother and avoiding technical problems during the show
moreover, since multiple acts shared the same six microphones, i also prepared presets that could be recalled whenever needed, which allow me to quickly switch between the appropriate parameters for different performers without having to rebuild the settings from scratch. this was especially useful during transitions, where time was limited and the next act needed to be ready very quickly
during the event, i had to balance audio adjustments with lighting operation while staying aware of what was happening on staeg. each act brought different requirements and the two sessions meant maintaining focus throughout the event. the audio, lighting, and stage crew all had to work together so performers could transition between acts smoothly
What I learned
operating audio and lighting simultaneously for a large-scale event like this was NOT easy. it pushed me to really manage my attention carefully
Some images from this project
| Person in Charge | Mr. Richardus Indarjono, Mr. Agus Santosa |
| Sound and Lights | Jason Fang |
| Stage Crew Lead | Timothy Joseph |
| Pictures | Laurencius Jonathan, Loviola Yosli |
You may also want to check this out...
James' Eighteenth Birthday
Birthday Celebration
photos from James' Eighteenth Birthday celebration, covering the party at the basket field

Nicole's Sweet Seventeenth
Birthday Celebration
collection of photos capturing Nicole's seventeenth birthday, from portraits to candid moments throughout the celebration

Nadine's Sweet Seventeenth
Birthday Celebration
series of photos capturing Nadine's seventeenth birthday